วันพุธที่ 20 กุมภาพันธ์ พ.ศ. 2556

Assignment 6 -->Process Description

Assignment 6 =>Process Description


1.worry
2.use
3.store
4.has
5.recharge
6.put
7.grows
8.damage
9.see
10.rotates
11.tell
12.plug



a  Maker sure that the edge of the pond is the same level all around.  2
b  When the pond is full, cut the liner to fit. 5
First  , dig a hole the size and shape you want your pond to be. 1
Next , line the hole with damp sand.3
Finally , put stones around the edge of the pond to complete it.6
After that, put the liner in the pond and fill it with water.4


A  4  It was still very hard to open and close, so I squirted even more Mr. Fixit inside.
B  7  But I still can’t go anywhere. When I checked the tyres , one of them was flat!
C  1  I didn’t use my bike all winter. In spring, the lock was rusted shut.
D  3  I soaked it in Mr. Fixit and left it for a while.
 5  I sprayed on some more Mr. Fixit and loosened it some more.
F  6  That did the trick. The lock now works perfectly.
G  2  It wouldn’t budge.
H  8 A little later, I gave it a tug and it moved.